Pillow Dreams Project and Vietnam
Vietnam, bordering Laos, China and Cambodia on one side and the Indian Ocean on the other, is one of the poorest and most densely populated countries in Southeast Asia.
After a long period of war, Vietnam is emerging and rebuilding itself economically. The population is young, hard working and ambitious.
Learn more >>
The sale of Vietnamese products directly benefit homeless teens in Vietnam through KOTO (Know One Teach One), an 18-month program providing training in all facets of the hospitality business.
Learn more >>
Click on an image for an enlarged view of the product.
Scroll down the page to see the entire collection of pillows from Vietnam.
To view the contents of your cart and to finalize your shopping session, click on the "View Cart" button located at the bottom of this page.
The pillows have designs on the front. The back (not shown) is plain.
Pillow inserts are not included. Purchase Pillow Inserts
Washing Instructions: Silk - Dry Clean Only, Cotton & Hemp - Handwash or Dry Clean
Black Silk with Mother of Pearl Buttons
Size: 16x 16 inches
Price: $30.00
Black Silk with Mother of Pearl Buttons
Size: 12 x 12 inches
Price: $25.00
Red Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $30.00
Green Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $30.00
Turquoise Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $30.00
Black Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $40.00
Purple Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $40.00
White Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $40.00
Black Silk with Mother of Pearl Buttons
Size: 12 x 12 inches
Price: $25.00
Pink/Light Pink Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $25.00
Red/Pink Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $25.00
Green/Orange Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $30.00
Dark Pink Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $25.00
Turquoise/Aqua Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $30.00
Turquoise Silk with Tassels and Tribal Design
Size: 12 x 12 inches
Price: $25.00
Turquoise Silk with Tribal Design in Center
Size: 16 x 16 inches
Price: $25.00
Turquoise Silk with Tribal Design in Center
Size: 12 x 12 inches
Price: $20.00
Orange Silk with Tribal Design in Center
Size: 16 x 16 inches
Price: $25.00
Orange Silk with Tribal Design in Center
Size: 12 x 12 inches
Price: $20.00
Turquoise Silk with Tribal Design in Center
Size: 12 x 12 inches
Price: $20.00
Pink Silk with Large Tribal Design Off-Center
Size: 16 x 16 inches
Price: $30.00
White Silk with Band of Blue Flowers
Size: 16 x 16 inches
Price: $35.00
Lime Green Silk with Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Green Silk with Colorful Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Red Silk with Colorful Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Lime Green Silk with Colorful Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Orange Hemp with Ethnic Detail and Tassels
Size: 16 x 16 inches
Price:$20.00
Green Silk with Ethnic Detail
Size: 16 x 16 inches
Price:$35.00
Green Silk with Ethnic Detail
Size: 16 x 16 inches
Price:$35.00
Red Velvet with Colorful Silk Design
Size: 12 x 16 inches
Price:$35.00
Brown Velvet with Colordul Silk Design
Size: 12 x 16 inches
Price:$35.00
Red Silk with Tribal Woven Design with Beads
Size: 16 x 16 inches
Price:$40.00
Green Silk with Tribal Woven Design
Size: 16 x 16 inches
Price:$40.00
Green/blue Cotton with Ethnic Embroidery
Size: 16 x 16 inches
Price:$25.00
Green Cotton with Ethnic Embroidery
Size: 16 x 16 inches
Price:$25.00
Red Cotton with Ethnic Embroidery
Size: 16 x 16 inches
Price:$25.00
Yellow/Green Cotton with Beads and Strings
Size: 16 x 16 inches
Price:$25.00
Lime/Yellow Cotton with Strings and Beads
Size: 16 x 16 inches
Price:$25.00
Turqoise/Orange Silk with Flowers
Size: 10 x 16 inches
Price:$30.00
Black/red Cotton with Woven Design and Beads
Size: 16 x 16 inches
Price:$25.00
Black/red Cotton with Woven Design and Beads
Size: 16 x 16 inches
Price:$25.00
Black/Red Cotton with Woven Design and Beads
Size: 12 x 16 inches
Price:$30.00
Red/Black Silk Purse with Leave Embroidry push button and pocket
Size: 5.5x9 Inches
Price: $ 46.00
Blue/Lime Silk Pursewith Leave Embroidery, push button and pocket
Size: 5.5x9 Inches
Price: $46.00
Gold/Pink Silk Purse with Leave Embroidery, Push button and pocket
Size: 5.5 x 9 Inches
Price: $46.00
Green Silk Bag with multi Colored Flowers, zipper and pocket
Size: 5x12 Inches
Price: $42.00
Green Silk Bag with Green Flowers, zipper and pocket
Size: 5x12 Inches
Price: $42.00
Purple/Burgundy Silk Purse with Butterfly Embroidery, push button closing and pocket
Size: 7x10.5 Inches
Price. $28.00
Green/light Silk Purse with Flower Embroidery, push button and pocket
Size: 7x11 Inches
Price: $38.00
Brown/Salmon Silk Purse with Flower Embroidery
Push button and pocket
Size: 7x11 Inches
Price: $38.00
Orange/lime Silk Scarf with Tribal Weaving
Size: 8x77 Inches
Price: $35.00
Black/Red Velvet/silk Scarf with Ethnic weaving
Size: 10x77 Inches
Price: $35.00
Black/red Velvet/Silk Scarf with Ethnic weaving
Size: 8x77 Inches
Price: $26.00
Teal Silk with Mother of pearl Buttons
Size: 16 x 16 inches
Price: $30.00