Pillow Dreams Project and Vietnam
Vietnam, bordering Laos, China and Cambodia on one side and the Indian Ocean on the other, is one of the poorest and most densely populated countries in Southeast Asia.
After a long period of war, Vietnam is emerging and rebuilding itself economically. The population is young, hard working and ambitious.
Learn more >>
The sale of Vietnamese products directly benefit homeless teens in Vietnam through KOTO (Know One Teach One), an 18-month program providing training in all facets of the hospitality business.
Learn more >>
Click on an image for an enlarged view of the product.
Scroll down the page to see the entire collection of pillows from Vietnam.
To view the contents of your cart and to finalize your shopping session, click on the "View Cart" button located at the bottom of this page.
The pillows have designs on the front. The back (not shown) is plain.
Pillow inserts are not included.
Washing Instructions: Silk - Dry Clean Only, Cotton & Hemp - Handwash or Dry Clean
Black Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $30.00
Green Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $30.00
Turquoise Silk with Mother of Pearl Buttons
Size: 16 x 16 inches
Price: $30.00
Pink/Light Pink Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $25.00
Red/Pink Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $25.00
Dark Pink Silk with Tassels and Tribal Design
Size: 16 x 16 inches
Price: $25.00
Turquoise Silk with Tribal Design in Center
Size: 16 x 16 inches
Price: $25.00
Orange Silk with Tribal Design in Center
Size: 12 x 12 inches
Price: $20.00
Turquoise Silk with Tribal Design in Center
Size: 12 x 12 inches
Price: $30.00
Green Silk with Colorful Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Red Silk with Colorful Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Lime Green Silk with Colorful Flower Embroidery
Size: 16 x 16 inches
Price: $40.00
Green Silk with Ethnic Detail
Size: 16 x 16 inches
Price: $35.00
Green Silk with Ethnic Detail
Size: 16 x 16 inches
Price: $35.00
Green/blue Cotton with Ethnic Embroidery
Size: 16 x 16 inches
Price: $25.00
Yellow/Green Cotton with Beads and Strings
Size: 16 x 16 inches
Price: $25.00
White Silk with Band of Blue Flowers
Size: 16 x 16 inches
Price: $40.00
Green Silk with Green Flowers
Size: 12 x 16 inches
Price: $25.00
Green Silk with Green Flowers
Size: 16 x 16 inches
Price: $30.00
Turqoise/Orange Silk with Flowers
Size: 10 x 16 inches
Price: $30.00
Lime Green/Turquoise Silk with Flowers
Size: 16 x 16 inches
Price: $25.00
Orange/Gold Silk with Flowers
Size: 12 x 16 inches
Price: $25.00
Turquoise/Lime Silk with Tassels, Beads and Embroidery
Size: 16 x 16 inches
Price: $30.00
Turquoise/Lime Silk with Tassels, Beads and Embroidery
Size: 16 x 16 inches
Price: $30.00
Turquoise/Lime Silk with Tassels, Beads and Embroidery
Size: 12 x 16 inches
Price: $25.00
Orange/Lime Silk with Tassels, Beads and Embroidery
Size: 16 x 16 inches
Price: $30.00
Orange/Lime Silk with Tassels, Beads and Embroidery
Size: 16 x 16 inches
Price: $30.00
Green/Orange Silk with Tassels, Beads and Embroidery
Size: 12 x 16 inches
Price: $30.00
Orange/Turquoise Silk with Butterfly Embroidery
Size: 16 x 16 inches
Price: $30.00
Lime Green/Orange Silk with Butterfly Embroidery
Size: 16 x 16 inches
Price: $30.00
Lime Green/Red Silk with Butterfly Embroidery
Size: 16 x 16 inches
Price: $30.00
Pink Silk with Flower Embroidery
Size: 12 x 12 inches
Price: $40.00
Turquoise Silk with Butterfly Embroidery
Size: 16 x 16 inches
Price: $40.00
Green Cotton with White Beaded Design
Size: 16 x 16 inches
Price: $25.00
Red Hemp with Ethnic Detail and Tassels
Size: 16 x 16 inches
Price: $20.00
Dark blue Cotton with Ethnic Design
Size: 16 x 16 inches
Price: $25.00
Orange Cotton with Ethnic Design
Size: 16 x 16 inches
Price: $30.00
Black/red Cotton with Woven Design and Beads
Size: 16 x 16 inches
Price: $30.00
Black/red Cotton with Woven Design and Beads
Size: 16 x 16 inches
Price: $30.00
Black/Red Cotton with Woven Design and Beads
Size: 12 x 16 inches
Price: $25.00
Black/Red Cotton with Woven Design and Beads
Size: 12 x 16 inches
Price: $25.00
Black/Red Cotton with Woven Design and Beads
Size: 12 x 16 inches
Price: $25.00
Black Cotton with Flower Embroidery
Size: 16 x 16 inches
Price: $35.00
Black Cotton with Flower Embroidery
Size: 12 x 12 inches
Price: $30.00
Orange/Brown Cotton with Flower Embroidery
Size: 16 x 16 inches
Price: $35.00
Orange/Brown Cotton with Flower Embroidery
Size: 12 x 12 inches
Price: $30.00
Vietnam - Thailand - South Africa
Home - About - News & Events - Disclaimer - Contact